Bristol Airport Guide
Home › News › Travel update
Travel updateBristol Airport (BRS)

Bristol Airport opens £10m Energy Centre, ditches gas boilers for heat pumps

By · Published
WhatsApp X
An airport building with a unique, curved roof design.
File photo: Yender Fonseca / Pexels

Bristol Airport has officially opened a new £10 million Energy Centre that has replaced every gas boiler in its terminal with air source heat pumps, a change the airport says makes it one of the first airports in the world to decarbonise a terminal in this way. The centre was formally opened on Wednesday 25 November by Sadik Al-Hassan MP for North Somerset, Luke Taylor MP, chair of the All-Party Parliamentary Group for the Future of Aviation, and Lord Strasburger.

According to Bristol Airport's own announcement, carried in full by Good News Post, the Energy Centre produces, stores and distributes low carbon energy to heat and cool the terminal. It uses 22 air source heat pumps and one electric boiler in place of the gas boilers that previously heated the building, and is expected to save around 625 tonnes of CO2 equivalent a year, which the airport compares to taking 135 passenger vehicles off the road for a year.

The regional business title TheBusinessDesk.com independently reported the same project on Tuesday, confirming the scale of the work: all gas boilers in the terminal have now been replaced, as part of a £10m decarbonisation project built around the Energy Centre.

Work on the project began in spring, with underground pipework laid to connect the Energy Centre to the terminal basement before the modular building itself, built off-site by NG Bailey, was lifted into position in July. Bristol Airport's sustainability director, Clare Hennessy, said the investment meant the airport would hit its interim carbon reduction target ahead of schedule, adding: "We're proud to be the first regional airport to install air source heat pumps in this way, enabling us to remove gas heating from the terminal."

Bristol was the first UK airport to commit to net zero operations by 2030, and the airport says the Energy Centre puts it on track to cut carbon emissions by 73% against 2019 levels by 2027, ahead of that 2030 goal. The airport already runs air source heat pumps in several auxiliary buildings, including its car rental site, the Silver Zone car park reception and the air traffic control tower.

The project has no direct effect on flights, check-in or terminal access, and passengers should not notice any change to their journey through the airport as a result of the switch.

What this means for your journey: this is a behind-the-scenes infrastructure upgrade with no impact on flights or terminal operations, so if you're flying from Bristol, your usual route through the airport is unaffected. If you still need to sort out how you'll get to the terminal, check our parking guide or public transport guide for the latest options.

Sources

Get a fixed-price Bristol Airport taxi → Follow Bristol Airport live travel alerts on WhatsApp

Posted by the Bristol Airport Guide team. Always confirm live travel conditions with the official operator or your airline before you set off.

Bristol Airport Guide is published by Cabo Tech Solution AI Ltd (company no. 16255667), Aztec Centre, Aztec West, Bristol, BS32 4TD. Editor: Jawad Burhan.

More Bristol Airport updates

Travel updateBristol Airport's £65m transport hub wins national civil engineering award1 days agoFlightsBristol Airport running normally this morning (Sat 21 Nov)5 days agoTravel updateEasyJet's new Bristol to Strasbourg route takes off today6 days agoTravel updateBristol Airport doubles parking enforcement funding after resident complaints6 days ago
Live alerts